More selected projects

Liminal Level

108_1108_1

Installation view: Manifesta 7, Ex-Alumix Factory, Bolzano Liminal Level. Photos Goran Vranic.

Liminal Level

2008. Aluminium construction, steel wire, LED lights, monofilament.
300 x 2000 x 300 cm.

The installation is located in the former Alumix factory, at the intermediate level between the first and the second floor. The area of the artwork is not physically accessible; its actual former use is unknown. It is a large adjunct space, clearly visible from the ground floor only when directly confronted; otherwise it may remain unseen.

Liminal Level places the dust-like reflections on the brink of visibility within this space, adding one more layer of the unknown to it. The net is made of monofilament lines, accompanied by light sources that trace this space and subtly inhabit it.

Installation view: Manifesta 7, Ex-Alumix Factory, Bolzano Liminal Level. Photos Goran Vranic.