Liminal Level
2008. Aluminium construction, steel wire, LED lights, monofilament. 3 x 20 x 3 m.
The installation is located in the former Alumix factory, at the intermediate level between the first and the second floor. The area of the artwork is not physically accessible and its actual former use is unknown. It is a large adjunct space, clearly visible from the ground floor only when directly confronted; otherwise it may remain unseen.
Installation view: Manifesta 7, Ex-Alumix Factory, Bolzano. Photos Goran Vranic.